DANUBE PETALZ

DANUBE Petalz Plunge Pools – Dubai, UAE

55 Balcony Plunge Pools for a Residential Development in Dubai

MAT Plastic Industries delivered the engineering, design, supply, installation, testing, commissioning, handover, and maintenance scope for 55 balcony plunge pools at the DANUBE Petalz development in Dubai, United Arab Emirates.

DPW Properties Development LLC created a project consisting of a residential and commercial tower located in Arjan First, Dubai. The building comprises two basement levels, a ground floor, six additional floors, and a roof level, accommodating a total of 339 apartments. The development benefits from convenient access to Sheikh Mohammed Bin Zayed Road.

GRP Structures and MEP Installation Scope

The project incorporates two pool configurations developed to accommodate the structural and operational requirements of the development.

The scope executed by MAT Plastic Industries covered engineering, design, supply, installation, testing, commissioning, handover, and maintenance activities for the balcony plunge pools. GRP structures and MEP systems formed part of the complete package delivered for the project.

Maintenance support continued after handover through defect rectification services carried out during the Defects Liability Period (DLP).

Pool Engineering and Maintenance Services

The delivery covered the complete lifecycle of the project, including engineering, procurement, installation, testing, commissioning, and handover, with continued support during the post-completion phase.

DANUBE Petalz represents another addition to MAT Plastic Industries’ portfolio of residential pool installations in Dubai, particularly in high-density urban developments.

Project Details

  • Project: DANUBE Petalz
  • Client: DPW Properties Development LLC
  • Location: Arjan First, Dubai, UAE
  • Status: Completed
  • Overall Completion: 100%
  • Number of Pools: 55 Balcony Plunge Pools
  • Pool Configurations: 2 Types
  • Services: Engineering, Design, Supply, Installation, Testing, Commissioning, Handing Over and Maintenance
  • Scope Includes:
    • Balcony Plunge Pools
    • GRP Structures
    • MEP Systems
    • Testing and Commissioning
    • Handing Over
    • Maintenance Services
    • Defect Rectification During DLP Period
  • Development Type: Residential and Commercial Tower
  • Building Configuration: Two Basement Levels, Ground Floor, Six Additional Floors, and Roof Level
  • Residential Units: 339 Apartments
  • Location Advantages: Direct access to Sheikh Mohammed Bin Zayed Road.
Inspecting a plunge pool for DANUBE PETALZ development inside MAT Plastic Industries Factory
Inspecting a plunge pool for DANUBE PETALZ development inside MAT Plastic Industries Factory

Project Photos

Scroll to Top